# test.py from date_calculator import DateCalculator from calendar_manager import CalendarManager from prediction_controller import PredictionController def test_calculate_prediction(): # Input event dates as strings event1_str = ["2023-01-01", "2023-01-10"] event2_str = ["2023-01-05", "2023-01-15"] # Input full project dates as strings project1_str = ["2025-01-02", "2025-02-11"] # Input half project dates as strings project2_str = ["2025-02-01", "2025-06-30"] project3_str = ["2024-05-05", "2024-06-07"] date_calculator = DateCalculator() calendar_manager = CalendarManager() prediction_controller = PredictionController(calendar_manager, date_calculator, ["Erziehungszeit 100%", "Erziehungszeit 50%", "Erziehungszeit pauschal", "Sonstige"]) calendar_manager.add_entry(event1_str[0], event1_str[1], "Sonstige") calendar_manager.add_entry(event2_str[0], event2_str[1], "Sonstige") calendar_manager.add_entry(project1_str[0], project1_str[1], "Erziehungszeit 100%") calendar_manager.add_entry(project2_str[0], project2_str[1], "Erziehungszeit 50%") calendar_manager.add_entry(project3_str[0], project3_str[1], "Erziehungszeit 50%") # Set launch date and duration prediction_controller.make_prediction("2023-01-01", 2) prediction = prediction_controller.get_prediction() # Output the result print(f"Predicted completion date: {prediction}") print(calendar_manager.list_entries()) # Run the test test_calculate_prediction()